| Project |
Location |
Client |
Volume |
Scope |
|
Solomon |
|
4,000m3 |
To supply concrete for bridge construction |
|
Solomon |
|
1,500m3 |
To supply concrete for mine / camp infrastucture |
|
Derby |
|
5,000m3 |
To supply concrete for prison works |
|
Cape Preston |
|
5,000m3 |
To supply concrete for camp construction |
|
MRD Tom Price |
|
2,000m3 |
To supply concrete for floodway construction |
|
Cape Lambert |
|
12,000m3 |
To supply concrete for load out facility upgrade |
| Varanus Island Gas Plant |
Varanus Island, Indian Ocean |
Apache Energy |
250m3 |
To supply concrete for minor civil works project. |
| Jimblebar Non Processing Plant |
Jimblebar Mine Site WA |
Wylie & Skene / BHP |
1400m3 |
To supply and place concrete for all infrastructures for the Non processing plant. Included all earthworks, concrete supply and placement. |
| Nammuldi Train Tunnel |
Nammuldi Mine Site WA |
NRW / Rio Tinto |
2500m3 |
To supply concrete for train tunnel infrastructure. |
| Rom Wall - Design and Construction |
Cloudbreak Mine |
Worley Parsons / FMG |
18,000m3 Stab Fill
1,500m3 Concrete |
To design and construct a pre-cast tilt up panel wall, 160m long x 17m high with mass stabilised backfill. Construct footing, supply and place concrete. |
| Goldfields Highway Culverts |
Wiluna WA |
Main Roads WA |
2000m3 |
To supply and place concrete & stabilised fill around culverts. Includes earthworks and culvert placement. |
| Moura Mine Infrastructure |
Moura Mine Site QLD |
Moura Mine |
1000m3 |
To supply concrete for the civil construction infrastructure projects. |
| Gull to Tunkawanna Rail Repairs |
Tom Price to Karratha Road WA |
Rio Tinto |
850m3 |
To supply concrete and stabilised fill (7% and 10%). Install culverts under damaged rail formation due to floods from cyclone. Includes earthworks, wrapping culverts, culvert installation, concrete and stabilised placement, construction of culvert head / wing walls. |
| Derby Highway Culverts |
Derby WA |
Main Roads WA |
400m3 |
To supply concrete and stabilised backfill for culvert construction. |
| Ore Body 18 |
Ore Body 18 Mine Site WA |
Wylie & Skene / BHP |
400m3 |
To construct minor infrastructure for the explosives depot. Includes supply and placement of concrete, detailed earthworks. |
| Lang Hancock Rail |
Hope Downs |
Thiess Contracting / Hancock Prospecting / Rio Tinto |
10,100m3 |
To supply concrete and stabilised fill (7% & 10%) for backfilling of culverts and head wall construction. |
| Parker Point Dump Hopper Back Fill |
Parker Point, Dampier |
Monodalphous / Rio Tinto |
6000m3 |
To supply stabilised backfill to fill disused dump hopper. |
| Boodarie Loco Refuelling Facility |
Boodarie Iron, Port Hedland WA |
Wylie & Skene / BHP |
1000m3 |
To construct infrastructure for the loco refuelling facility and associated concrete works. |
| Wharf Pile Filling |
Cape Lambert (3.1km out to sea) |
McConnell Dowell / SKM - Rio Tinto |
1000m3 |
To supply iron ore fines concrete and pump into piles at various locations on the dolphins at the end of the wharf. Concrete was supplied and placed off a 500 ton barge. |